The Space Shuttle Solid Rocket Booster (SRB) was the first solid-propellant rocket to be used for primary propulsion on a vehicle used for human spaceflight. The two SRBs provided 85% of the Space Shuttle's thrust at liftoff and for the first two minutes of ascent. After burnout, they were jettisoned, and parachuted into the Atlantic Ocean, where they were recovered, examined, refurbished, and reused.

The Space Shuttle SRBs were the most powerful solid rocket motors ever flown at the time of their debut. The Space Launch System (SLS) SRBs, adapted from the shuttle, surpassed it as the most powerful solid rocket motors ever flown, after the launch of the Artemis 1 mission in 2022. Each Space Shuttle SRB provided a maximum thrust, roughly double the most powerful single-combustion chamber liquid-propellant rocket engine ever flown, the Rocketdyne F-1. With a combined mass of about , they comprised over half the mass of the Shuttle stack at liftoff.

The motor segments of the SRBs were manufactured by Thiokol of Brigham City, Utah, which was later purchased by Alliant Techsystems (ATK). The prime contractor for the integration of all the components and retrieval of the spent SRBs, was United Space Boosters Inc., a subsidiary of Pratt & Whitney. The contract was subsequently transitioned to United Space Alliance, a joint venture of Boeing and Lockheed Martin.

Out of 270 SRBs launched over the Shuttle program, all but four were recovered – those from STS-4 (due to a parachute malfunction) and STS-51-L (destroyed by the range safety officer during the Challenger disaster). Over 5,000 parts were refurbished for reuse after each flight. The final set of SRBs that launched STS-135 included parts that had flown on 59 previous missions, including STS-1. Recovery also allowed post-flight examination of the boosters, identification of anomalies, and incremental design improvements. Refurbished segments have been used on the solid rocket boosters of the Space Launch System.

Overview

thumb|right|Solid Rocket Booster (SRB) separation during [[STS-117]]

The two reusable SRBs provided the main thrust to lift the shuttle off the launch pad and up to an altitude of about . While on the pad, the two SRBs carried the entire weight of the external tank and orbiter and transmitted the weight load through their structure to the mobile launcher platform. Each booster had a liftoff thrust of approximately at sea level, increasing shortly after liftoff to .

The SRBs were the largest solid-propellant motors ever flown until 2022 and the first solid-propellant rockets designed for reuse. Each is long and in diameter. Each SRB weighed approximately at launch. The two SRBs constituted about 69% of the total lift-off mass. The primary propellants were ammonium perchlorate as the oxidizer along with aluminum powder and PBAN as fuel. The total propellant load for each solid rocket motor weighed approximately (see ). The inert weight of each SRB was approximately .

Primary elements of each booster were the motor (including case, propellant, igniter, and nozzle), structure, separation systems, operational flight instrumentation, recovery avionics, pyrotechnics, deceleration system, thrust vector control system, and range safety destruct system.

While the terms solid rocket motor and solid rocket booster are often used interchangeably, in technical use they have specific meanings. The term solid rocket motor applied to the propellant, case, igniter and nozzle. Solid rocket booster applied to the entire rocket assembly, which included the rocket motor as well as the recovery parachutes, electronic instrumentation, separation rockets, range safety destruct system, and thrust vector control.

Each booster was attached to the external tank at the SRB's aft frame by two lateral sway braces and a diagonal attachment. The forward end of each SRB was attached to the external tank at the forward end of the SRB's forward skirt. On the launch pad, each booster also was attached to the mobile launcher platform at the aft skirt by four holddown studs, with frangible nuts that were severed at liftoff.

The boosters were composed of seven individually manufactured steel segments. These were assembled in pairs by the manufacturer and then shipped to Kennedy Space Center by rail for final assembly. The segments were fixed together using circumferential tang, clevis, and clevis pin fastening, and sealed with O-rings (originally two, changed to three after the Challenger Disaster in 1986) and heat-resistant putty.

thumb|750px|center|Labeled diagram of SRB

Components

500px|thumb|SRB Diagram

Hold-down posts

Each solid rocket booster had four hold-down posts that fit into corresponding support posts on the mobile launcher platform. Hold-down studs held the SRB and launcher platform posts together. Each stud had a nut at each end, the top one being a frangible nut. The top nut contained two explosive charges initiated by NASA standard detonators (NSDs), which were ignited at solid rocket motor ignition commands.

When the two NSDs were ignited at each hold down, the frangible nut fractured, releasing the hold-down stud. The stud traveled downward because of the release of tension in the stud (pretensioned before launch), NSD gas pressure and gravity. The stud was stopped by the stud deceleration stand, which contained sand. The hold-down stud was long and in diameter. The frangible nut was captured in a blast container mounted on the aft skirt of the SRB.

The solid rocket motor ignition commands were issued by the orbiter's computers through the master events controllers to the hold-down pyrotechnic initiator controllers (PICs) on the mobile launcher platform. They provided the ignition to the hold-down NSDs. The launch processing system monitored the SRB hold-down PICs for low voltage during the last 16 seconds before launch. PIC low voltage would initiate a launch hold.

Electrical power distribution

Electrical power distribution in each SRB consisted of orbiter-supplied main DC bus power to each SRB via SRB buses labeled A, B and C. Orbiter main DC buses A, B and C supplied main DC bus power to corresponding SRB buses A, B and C. In addition, orbiter main DC bus C supplied backup power to SRB buses A and B, and orbiter bus B supplied backup power to SRB bus C. This electrical power distribution arrangement allowed all SRB buses to remain powered in the event one orbiter main bus failed.

The nominal operating voltage was DC.

Hydraulic power units

Each SRB consists of two self-contained, independent Hydraulic Power Units (HPUs), used to actuate the thrust vector control (TVC) system. Each HPU consisted of an auxiliary power unit (APU), fuel supply module, hydraulic pump, hydraulic reservoir and hydraulic fluid manifold assembly. The APUs were fueled by hydrazine and generated mechanical shaft power to drive a hydraulic pump that produced hydraulic pressure for the SRB hydraulic system. The two separate HPUs and two hydraulic systems were located on the aft end of each SRB between the SRB nozzle and aft skirt. The HPU components were mounted on the aft skirt between the rock and tilt actuators. The two systems operated from T minus 28 seconds until SRB separation from the orbiter and external tank. The two independent hydraulic systems were connected to the nozzle rock and tilt servoactuators.

The HPU controller electronics were located in the SRB aft integrated electronic assemblies (IEAs) on the aft external tank attach rings.

The HPUs and their fuel systems were isolated from each other. Each fuel supply module (tank) contained of hydrazine. The fuel tank was pressurized with gaseous nitrogen at , which provided the force to expel (positive expulsion) the fuel from the tank to the fuel distribution line, maintaining a positive fuel supply to the APU throughout its operation.

In the APU, a fuel pump boosted the hydrazine pressure and fed it to a gas generator. The gas generator catalytically decomposed the hydrazine into hot, high-pressure gas; a two-stage turbine converted this into mechanical power, driving a gearbox. The waste gas, now cooler and at low pressure, was passed back over the gas generator housing to cool it before being dumped overboard. The gearbox drove the fuel pump, its own lubrication pump, and the HPU hydraulic pump. A startup bypass line went around the pump and fed the gas generator using the nitrogen tank pressure until the APU speed was such that the fuel pump outlet pressure exceeded that of the bypass line, at which point all the fuel was supplied to the fuel pump.

When the APU speed reached 100%, the APU primary control valve closed, and the APU speed was controlled by the APU controller electronics. If the primary control valve logic failed to the open state, the secondary control valve assumed control of the APU at 112% speed.

Each HPU on an SRB was connected to both servoactuators on that SRB by a switching valve that allowed the hydraulic power to be distributed from either HPU to both actuators if necessary. Each HPU served as the primary hydraulic source for one servoactuator, and a secondary source for the other servoactuator. Each HPU possessed the capacity to provide hydraulic power to both servoactuators within 115% operational limits in the event that hydraulic pressure from the other HPU should drop below . A switch contact on the switching valve closed when the valve was in the secondary position. When the valve was closed, a signal was sent to the APU controller, that inhibited the 100% APU speed control logic and enabled the 112% APU speed control logic. The 100-percent APU speed enabled one APU/HPU to supply sufficient operating hydraulic pressure to both servoactuators of that SRB.

The APU 100-percent speed corresponded to 72,000 rpm, 110% to 79,200 rpm, and 112% to 80,640 rpm.

The hydraulic pump speed was 3,600 rpm and supplied hydraulic pressure of . A high pressure relief valve provided overpressure protection to the hydraulic system and relieved at .

The APUs/HPUs and hydraulic systems were reusable for 20 missions.

===Propellant===<!-- This section is linked from LZ 129 Hindenburg -->

thumb|left|Sections of the SRB filled with propellant being connected for the STS-134 mission

The rocket propellant mixture in each solid rocket motor consisted of ammonium perchlorate (oxidizer, 69.6% by weight), atomized aluminum powder (fuel, 16%), iron oxide (catalyst, 0.4%), PBAN (binder, also acts as fuel, 12.04%), and an epoxy curing agent (1.96%). This propellant is commonly referred to as ammonium perchlorate composite propellant (APCP). This mixture gave the solid rocket motors a specific impulse of at sea level or in a vacuum. Upon ignition, the motor burned the fuel at a nominal chamber pressure of .

Aluminum was chosen as a propellant due to high volumetric energy density, and its resilience to accidental ignition. Aluminum has a specific energy density of about 31.0&nbsp;MJ/kg .

The propellant had an 11-pointed star-shaped perforation in the forward motor segment and a double-truncated-cone perforation in each of the aft segments and aft closure. This configuration provided high thrust at ignition and then reduced the thrust by approximately a third 50 seconds after lift-off to avoid overstressing the vehicle during maximum dynamic pressure (max. Q).

Descent and recovery

thumb|Splashdown of the right hand SRB from the launch of [[STS-124.]]

The SRBs are jettisoned from the shuttle system at 2 minutes and an altitude of about . After continuing to rise to about , the SRBs begin to fall back to earth and once back in the denser atmosphere are slowed by a parachute system to prevent damage on ocean impact. A command is sent from the orbiter to the SRB just before separation to apply battery power to the recovery logic network. A second, simultaneous command arms the three nose cap thrusters (for deploying the pilot and drogue parachute), the frustum ring detonator (for main parachute deployment), and the main parachute disconnect ordnance.

The recovery sequence begins with the operation of the high-altitude baroswitch, which triggers the pyrotechnic nose cap thrusters. This ejects the nose cap, which deploys the pilot parachute. Nose cap separation occurs at a nominal altitude of , about 218 seconds after SRB separation. The diameter conical ribbon pilot parachute provides the force to pull lanyards attached to cut knives, which cut the loop securing the drogue retention straps. This allows the pilot chute to pull the drogue pack from the SRB, causing the drogue suspension lines to deploy from their stored position. At full extension of the twelve suspension lines, the drogue deployment bag is stripped away from the canopy, and the diameter conical ribbon drogue parachute inflates to its initial reefed condition. The drogue disreefs twice after specified time delays (using redundant 7- and 12-second reefing line cutters), and it reorients/stabilizes the SRB for main chute deployment. The drogue parachute has a design load of approximately and weighs approximately .

thumb|The solid rocket boosters, jettisoned from the [[Space Shuttle Discovery|Space Shuttle Discovery following the launch of STS-116, floating in the Atlantic Ocean about 150 miles northeast of Cape Canaveral. On this occasion, the boosters landed several miles apart, but overnight winds and currents drifted them to the same location]]

After the drogue chute has stabilized the SRB in a tail-first attitude, the frustum is separated from the forward skirt by a pyrotechnic charge triggered by the low-altitude baroswitch at a nominal altitude of about 243 seconds after SRB separation. The frustum is then pulled away from the SRB by the drogue chute. The main chute suspension lines are pulled out from deployment bags that remain in the frustum. At full extension of the lines, which are long, the three main chutes are pulled from their deployment bags and inflate to their first reefed condition. The frustum and drogue parachute continue on a separate trajectory to splashdown. After specified time delays (using redundant 10- and 17-second reefing line cutters), the main chute reefing lines are cut and the chutes inflate to their second reefed and full open configurations. The main chute cluster decelerates the SRB to terminal conditions. Each of the diameter, 20° conical ribbon parachutes have a design load of approximately and each weighs approximately . These parachutes are the largest that have ever been used, in both deployed size and load weight. The RSRM nozzle extension is severed by a pyrotechnic charge about 20 seconds after frustum separation.

Water impact occurs about 279 seconds after SRB separation at a nominal velocity of . The water impact range is approximately off the eastern coast of Florida. Because the parachutes provide for a nozzle-first impact, air is trapped in the empty (burned out) motor casing, causing the booster to float with the forward end approximately out of the water.

thumb|Solid rocket booster of the [[STS-131 mission being recovered and transported to Cape Canaveral by the .]]

Formerly, the main chutes were released from the SRB at impact using a parachute release nut ordnance system (residual loads in the main chutes would deploy the parachute attach fittings with floats tethered to each fitting). The current design keeps the main chutes attached during water impact (initial impact and slapdown). Salt Water Activated Release (SWAR) devices are now incorporated into the main chute riser lines to simplify recovery efforts and reduce damage to the SRB. The drogue deployment bag/pilot parachutes, drogue parachutes and frustums, each main chute, and the SRBs are buoyant and are recovered.

Specially fitted NASA recovery ships, the and the , recover the SRBs and descent/recovery hardware. Once the boosters are located, the Diver Operated Plug (DOP) is maneuvered by divers into place to plug the SRB nozzle and drain the water from the motor case. Pumping air into and water out of the SRB causes the SRB to change from a nose-up floating position to a horizontal attitude more suitable for towing. The retrieval vessels then tow the boosters and other objects recovered back to Kennedy Space Center.

Challenger disaster

thumb|left|Camera captures grey smoke being emitted from the right-hand SRB on [[Space Shuttle Challenger|Space Shuttle Challenger just after booster ignition at the start of the ill-fated STS-51-L.]]

The loss of Space Shuttle Challenger originated with a system failure of one of its SRBs. The cause of the accident was found by the Rogers Commission to be "a faulty design unacceptably sensitive to a number of factors" of the SRB joints compounded by unusually cold weather the morning of the flight. The field joint design was flawed, with flexure of the joints during launch compromising the seal of the large rubber O-rings and allowing them to extrude further into the joint and erode as hot exhaust gases passed through during past launches. Additionally, the O-rings were not resilient at low temperatures like those of the January 1986 morning of the accident (). A cold-compromised joint in the right SRB failed at launch and allowed hot gases from within that rocket booster to sear a hole into the adjacent main external fuel tank and also weaken the lower strut holding the SRB to the external tank. The leak in the SRB joint caused the eventually catastrophic failure of the lower strut and partial detachment of the SRB, which led to a collision between the SRB and the external tank. With the external tank being destroyed and the shuttle stack, traveling at a speed of Mach1.92 at , thrusted off-axis by the right SRB as well as the tank's collapse, Challenger disintegrated. Both SRBs survived the accident initially, until they were destroyed by the range safety officer. Prior to the disaster, a teleconference was held between Marshall Spaceflight Center, Kennedy Space Center, and Morton Thiokol to discuss the upcoming launch. Originally, Morton Thiokol held the stance that the launch temperatures were too cold for launch. However, after a period of recess, Morton Thiokol had changed their stance, and was no longer opposed to launch.

Construction and delivery

The prime contractor for the manufacture of the SRB motor segments was ATK Launch Systems (formerly Morton Thiokol Inc.) Wasatch Division based in Magna, Utah.

United Space Boosters Inc. (USBI), a division of Pratt & Whitney, under United Technologies, was the original SRB prime contractor for SRB assembly, checkout and refurbishment for all non-solid-rocket-motor components and for SRB integration. They were the longest-running prime contractor for the Space Shuttle that was part of the original launch team. USBI was absorbed by United Space Alliance as the Solid Rocket Booster Element division in 1998 and the USBI division was disbanded at Pratt & Whitney the following year. At its peak, USBI had over 1500 personnel working on the Shuttle Boosters at KSC, FL and Huntsville, Alabama.

Components of the SRBs were transported from Utah to the Kennedy Space Center in Florida via rail over twelve days covering and eight states. Each segment and its custom built rail car weighed approximately . Cars carrying SRBs were separated by empty cars to distribute the load over bridges and trestles, particularly the bridge over the Indian River, the last bridge on the train's journey. Following recovery, spent segments were loaded onto those same train cars and returned to Utah for refurbishment and refueling.

Incident

On May 2, 2007, a freight train carrying segments of the space shuttle's solid rocket boosters derailed in Myrtlewood, Alabama, after a rail trestle collapsed. The train was carrying eight SRB segments intended for STS-120 and STS-122. Four segments dropped approximately . Four other segments along with a car carrying aft exit cones (nozzles), not yet on the trestle, remained on solid ground. The segments that fell from the trestle were recovered and returned to Utah for inspection. After analyses of the forces put on the remaining four segments that had not fallen were found to be well within tolerances, those segments continued on to Florida.

Upgrade projects not put into service

Advanced Solid Rocket Motor (ASRM) Project (1988–1993)

In 1988–1989, NASA was planning on replacing the post-Challenger SRBs with a new Advanced Solid Rocket Motor (ASRM) to be built by Aerojet at a new facility, designed by subcontractor, RUST International, on the location of a cancelled Tennessee Valley Authority nuclear power plant, at Yellow Creek, Mississippi (Yellow Creek Nuclear Plant).

The ASRM would be slightly wider (the booster's diameter would be increased from 146 inches to 150 inches) and have 200,000 pounds of extra propellant, and have produced additional thrust in order to increase shuttle payload by about 12,000lb, after robotic assembly systems and computers were on-site and approximately 2 billion dollars spent, in favor of continued use of the SRB after design flaw corrections.

Filament-wound cases

In order to provide the necessary performance to launch polar-orbiting shuttles from the SLC-6 launch pad at Vandenberg Air Force Base in California, SRBs using filament-wound cases (FWC) were designed to be more lightweight than the steel cases used on Kennedy Space Center-launched SRBs. Unlike the regular SRBs, which had the flawed field joint design that led to the Challenger Disaster in 1986, the FWC boosters had the "double tang" joint design (necessary to keep the boosters properly in alignment during the "twang" movement when the SSMEs are ignited prior to liftoff), but used the two O-ring seals. With the closure of SLC-6, the FWC boosters were scrapped by ATK and NASA, but their field joints, albeit modified to incorporate the current three O-ring seals and joint heaters, were later (after STS-51L) incorporated into the field joints on the SRBs used until the last flight in 2011.

Five-segment booster

Prior to the destruction of the Space Shuttle Columbia in 2003, NASA investigated the replacement of the current 4-segment SRBs with either a 5-segment SRB design or replacing them altogether with liquid-fueled "flyback" boosters using either Atlas V or Delta IV EELV technologies. The 5-segment SRB, which would have required little change to the current shuttle infrastructure, would have allowed the space shuttle to carry an additional of payload in an International Space Station-inclination orbit, eliminate the dangerous Return-to-Launch Site (RTLS) and Trans-Oceanic Abort (TAL) modes, and, by using a so-called dog-leg maneuver, fly south-to-north polar orbiting flights from Kennedy Space Center.

The five-segment SRB would use a wider nozzle throat to keep within the pressure limit of the existing segment casings.

After the destruction of Columbia, NASA shelved the five-segment SRB for the Shuttle Program, for safety reasons. One five-segment engineering test motor, ETM-03, was fired on October 23, 2003.

As part of the Constellation Program, the first stage of the Ares I rocket was planned to use five-segment SRBs; in September 2009 a five-segment Space Shuttle SRB (DM-1) was static fired on the ground in ATK's desert testing area in Utah. Additional tests (DM-2 and DM-3) were carried out in Aug 2010 and Sept 2011.

After the Constellation Program was cancelled in 2011, the new Space Launch System (SLS) was designated to use five-segment boosters. The first test of a SRB for SLS (QM-1) was completed in early 2015, a second test (QM-2) was performed in mid 2016 at Orbital ATK's Promontory, Utah facility.

Displays

Space Shuttle Solid Rocket Boosters are on display at the Kennedy Space Center Visitor Complex in Florida, the Stennis Space Center in Hancock County, Mississippi, the United States Space & Rocket Center in Huntsville, Alabama, the March Field Air Museum on March ARB in California, and at Orbital ATK's facility near Promontory, Utah.

A partial filament-wound booster case is on display at Pima Air & Space Museum in Tucson, Arizona. Two flight-worthy Solid Rocket Boosters with parts flown in 81 different Space Shuttle missions are in a vertical stack configuration at the California Science Center attached to the last surviving flight-worthy external tank (ET-94) and Space Shuttle Endeavour in Los Angeles, California. The display will be opened to the public in the new Samuel Oschin Air and Space Center in 2026 or 2027.

Current, future and proposed uses

thumb|The Ares I-X prototype launches from LC-39B, 15:30 UTC, October 28, 2009 – this was as of October 2022 the sole flight of a launch vehicle [[wikt:derived|derived from the SRB.]]

Over time several proposals to reuse the SRB design were presented – however, as of 2016 none of these proposals progressed to regular flights before being cancelled. Until the 2022 first test flight of the Space Launch System (SLS), a sole test-flight of the Ares I-X prototype in 2009 was the furthest any of these proposals progressed.

Ares

NASA initially planned to reuse the four-segment SRB design and infrastructure in several Ares rockets, which would have propelled the Orion spacecraft into orbit. In 2005, NASA announced the Shuttle-Derived Launch Vehicle slated to carry the Orion Crew Exploration Vehicle into low-Earth orbit and later to the Moon. The SRB-derived Crew Launch Vehicle (CLV), named Ares I, was planned to feature a single modified 4-segment SRB for its first stage; a single liquid-fueled modified Space Shuttle Main Engine would have powered the second stage.

The Ares I design updated in 2006 featured one 5-segment SRB (originally developed for the Shuttle, but never used) as a first stage; the second stage was powered by an uprated J-2X engine, derived from the J-2, which had been used in the upper stage of Saturn V and Saturn IB. In place of the standard SRB nosecone, the Ares I would have a tapered interstage assembly connecting the booster proper with the second stage, an attitude control system derived from the Regulus missile system, and larger, heavier parachutes to lower the stage into the Atlantic Ocean for recovery.

Also introduced in 2005, was a heavy-lift Cargo Launch Vehicle (CaLV) named Ares V. Early designs of the Ares V utilized 5 standard-production SSMEs and a pair of 5-segment boosters identical to those proposed for the Shuttle, while later plans redesigned the boosters around the RS-68 rocket engine used on the Delta IV EELV system. Initially, NASA switched over to a system using the 5-segment boosters and a cluster of 5 RS-68s (which resulted in a widening of the Ares V core unit), then NASA reconfigured the vehicle with 6 RS-68B engines, with the boosters themselves becoming 5.5-segment boosters, with an additional half-segment to provide additional thrust at liftoff.

That final redesign would have made the Ares V booster taller and more powerful than the now-retired Saturn V/INT-20, N-1, and Energia rockets, and would have allowed the Ares V to place both the Earth Departure Stage and Altair spacecraft into low-Earth orbit for later on-orbit assembly. Unlike the 5-segment SRB for the Ares I, the 5.5-segment boosters for the Ares V were to be identical in design, construction, and function to the current SRBs except for the extra segments. Like the shuttle boosters, the Ares V boosters would fly an almost-identical flight trajectory from launch to splashdown.

The Constellation program, including Ares I and Ares V, was canceled in October 2010 by the passage of the 2010 NASA authorization bill.

DIRECT

The DIRECT proposal for a new, Shuttle-Derived Launch Vehicle, unlike the Ares I and Ares V boosters, used a pair of classic 4-segment SRBs with the SSMEs used on the Shuttle.

Athena III

In 2008, PlanetSpace proposed the Athena III launch vehicle for ISS resupply flights under the COTS program; it would have featured segments from the original SRB design.

Space Launch System (SLS)

thumb|upright=1.35|Comparison of the Saturn V, Space Shuttle, Ares I, Ares V, Ares IV, SLS Block I and SLS Block II

The first versions (Blocks 1 and 1B) of the Space Launch System (SLS) use a pair of five-segment Solid Rocket Boosters (SRBs), which were developed from the four-segment SRBs used for the Shuttle. Modifications for the SLS included the addition of a center booster segment, new avionics, and new insulation which eliminates the Shuttle SRB's asbestos and is lighter. The five-segment SRBs provide approximately 25% more total impulse than the Shuttle SRB, and are not recovered after use.<gallery>

File:SLS FSB1 test booster.jpg|SLS SRB being tested in 2021.

File:SLS Booster Segments in RPSF and Surge Facility (KSC-20201117-PH-KLS01 0057).jpg|Multiple segments of the SLS SRB at Kennedy Space Center in 2020, waiting for their final assembly.

File:Artemis II Booster Processing - Segment Cover Removal and Inspec (KSC-20231127-PH-KLS01 0020).jpg|Cross-section of an Artemis II booster segment.

File:SLS Artemis I Aft Segment Stacking (KSC-20201124-PH-GEB01 0117).jpg|Aft booster segments for Artemis I being stacked at the Vehicle Assembly Building, as seen in 2020.

File:Artemis I SLS Core Stage Prep for Lift Mate.jpg|The fully-stacked boosters that would be powering Artemis I, as seen in 2021 at the Vehicle Assembly Building.

File:Artemis II Launch (cropped).jpg|The two boosters being ignited, sending Artemis II into space.

File:Artemis II Launch (NHQ202604010222).jpg|The two booster separating from Artemis II minutes after the launch.

</gallery>

See also

  • Solid rocket booster
  • PEPCON disaster
  • Studied Space Shuttle variations and derivatives

References

  • NASA Technical Report 19720007149 Origins of the shuttle SRB, engineering study for NASA 1971, volume 1, summary
  • NASA Technical Report 19720015135 Origins of the shuttle SRB, engineering study for NASA 1971, volume 2, technical report
  • Solid Rocket Booster Separation video
  • Liberty Star and Freedom Star bio page
  • Cary Rutland Collection, The University of Alabama in Huntsville Archives and Special Collections Files of Cary Rutland, deputy of the SRB program after the Challenger disaster