Richmond Lock and Footbridge is a lock, rising and falling low-tide barrage integrating controlled sluices and pair of pedestrian bridges on the River Thames in southwest London, England, and is a Grade II* listed structure. It is the furthest downstream of the forty-five Thames locks and the only one owned and operated by the Port of London Authority. It was opened in 1894 and is north-west of the centre of Richmond in a semi-urban part of southwest London. Downstream are Syon Park and Kew Gardens on opposite banks. It connects the promenade at Richmond with the neighbouring district of St. Margarets on the west bank during the day and is closed at night to pedestrians – after 19:30 GMT or after 21:30 when BST is in use. At high tide the sluice gates are raised and partly hidden behind metal arches forming twin footbridges.
It was built to maintain the lowest-lying head of water of the forty-five navigable reaches of the Thames above the rest of the Tideway. Below the structure for a few miles, at low tide, the navigable channel is narrow and restricts access for vessels with the greatest draft. The next major point of mooring below the lock is, accordingly, at Brentford Dock.
Description
The chief engineer who designed the core of the structure, F. G. M. Stoney, took out seven patents relating to sluices between 1873 and 1894.
Ownership and operation
The Port of London Act 1908 (8 Edw. 7. c. 68) transferred responsibility for all points of the river downstream of a point below Teddington Lock to the Port of London Authority thereby including this structure.
Reasons for construction
When the London Bridge of 1209 to 1831 was demolished the removal of its bulky and elaborate piers resulted in the tides upstream returning to the rapid flows as they were downstream and before its forming of a near-barrier. That bridge was particularly dam-like when it housed 200 buildings in the Tudor period and in depictions at the time of the Great Fire of London which spared the bridge. This change, together with dredging of the lower river (lowest reaches) and construction of Teddington Lock and weir, meant that for hours of each day the Thames at Richmond, Twickenham, Ham, Petersham and northern Teddington, was a shallow watercourse running past great mud and shingle banks. The exception was after weeks of above-average rainfall when the river is known as in spate however such outflow hinders navigation upstream.<!--See draw-off navigation advice, Port of London Authority, what is the draw off?--> By the late 19th century water extraction above Teddington had increased to four of five of the city's main waterworks and after light or normal rainfall more barges found it impossible to navigate the reach during and for hours around the two low tides each day. In 1890, after many years of petitioning, an act of Parliament was enacted to build the half-lock and weir, the Richmond Footbridge Sluices, Lock and Slipway Act 1890 (53 & 54 Vict. c. ccxxiv). This is among a small minority of Thames locks not to have been built around an island or islands (aits).
thumb|Richmond Footbridge
Details of design
A barge lock was constructed against the north-east ("Surrey") side. This is followed by four immense brick piers protected by large ashlar stone cutwaters (starlings). These in turn support relatively thin stone dressings reaching to the metal parapet level, carved in a classical style with reredos and cornices, supporting painted metal arches. A matching-colour balustrade is above the arches finished with black lanterns, metal pillars and simple finials. The piers house the barriers and the arches support a pair of horizontal decks (walkways). Against the opposite bank is a gently elevated slipway accessed from upstream and downstream parts of the river. As a superstructure was required to hold the suspended barriers, authorities agreed to build this in the form of two footbridges.
The bridge was formally opened on 19 May 1894 by the then Duke of York (who later became King George V), having cost £61,000 (). The toll booths and the remains of the turnstile housings remain. Since two unconnected footbridges exist, one either side of the sluice-gate-holding brickwork and mechanisms, four toll booths and turnstiles had to be provided to collect the tolls.