The Ouham River is a river in Central Africa, and one of the main headwaters of the Chari River. The Ouham originates in the Central African Republic between the Nana-Mambéré and Ouham-Pendé prefectures, crossing into Chad where it joins the Chari about 25 km north of Sarh. Tributaries are the Baba, Fafa, Nana Bakassa, and the Nana Barya.

Hydrometry

The flow of the river has been observed over 33 years (1951–84) in Moïssala a town in Chad about 150 km above the mouth of the Chari. At Moïssala, the observed average annual flow during this period was 480 m³ / s fed by an area of about 67,600 km approximately 95% of the total catchment area of the River.

<div class="center">

The average monthly flow of the river Sara at hydrological station of Moïssala (in m³ / s )

(Calculated using the data for a period of 33 years, 1951–84)

<timeline>

Colors=

id:lightgrey value:gray(0.8)

id:darkgrey value:gray(0.3)

id:sfondo value:rgb(1,1,1)

id:barra value:rgb(0.6,0.8,0.9)

ImageSize = width:600 height:280

PlotArea = left:40 bottom:40 top:20 right:20

DateFormat = x.y

Period = from:0 till:1500

TimeAxis = orientation:vertical

AlignBars = justify

ScaleMajor = gridcolor:lightgrey increment:200 start:0

ScaleMinor = gridcolor:lightgrey increment:100 start:0

BackgroundColors = canvas:sfondo

BarData=

bar:Jan text:January

bar:Fév text:February

bar:Mar text:Marz

bar:Avr text:April

bar:Mai text:May

bar:Jun text:June

bar:Jul text:July

bar:Aoû text:August

bar:Sep text:Sept.

bar:Oct text:Oct.

bar:Nov text:Nov.

bar:Déc text:Dec.

PlotData=

color:barra width:30 align:left

bar:Jan from:0 till: 197

bar:Fév from:0 till: 130

bar:Mar from:0 till: 85

bar:Avr from:0 till: 66

bar:Mai from:0 till: 95

bar:Jun from:0 till: 140

bar:Jul from:0 till: 327

bar:Aoû from:0 till: 870

bar:Sep from:0 till: 1430

bar:Oct from:0 till: 1303

bar:Nov from:0 till: 749

bar:Déc from:0 till: 367

PlotData=

bar:Jan at: 197 fontsize:S text: 197 shift:(-10,5)

bar:Fév at: 130 fontsize:S text: 130 shift:(-10,5)

bar:Mar at: 85 fontsize:S text: 85 shift:(-10,5)

bar:Avr at: 66 fontsize:S text: 66 shift:(-10,5)

bar:Mai at: 95 fontsize:S text: 95 shift:(-10,5)

bar:Jun at: 140 fontsize:S text: 140 shift:(-10,5)

bar:Jul at: 327 fontsize:S text: 327 shift:(-10,5)

bar:Aoû at: 870 fontsize:S text: 870 shift:(-10,5)

bar:Sep at: 1430 fontsize:S text: 1.430 shift:(-10,5)

bar:Oct at: 1303 fontsize:S text: 1.303 shift:(-10,5)

bar:Nov at: 749 fontsize:S text: 749 shift:(-10,5)

bar:Déc at: 367 fontsize:S text: 367 shift:(-10,5)

</timeline>

</div>

See also

  • Lake Chad replenishment project
  • Waterway

References