thumb|250x250px|Exercise Desert Rock I during the Buster Dog test.
Operation Buster–Jangle was a series of seven (six atmospheric, one cratering) nuclear weapons tests conducted by the United States in late 1951 at the Nevada Test Site. Buster–Jangle was the first joint test program between the DOD (Operation Buster) and Los Alamos National Laboratories (Operation Jangle). As part of Operation Buster, 6,500 troops were involved in the Operation Desert Rock I, II, and III exercises in conjunction with the tests. The last two tests, Operation Jangle, evaluated the cratering effects of low-yield nuclear devices. This series preceded Operation Tumbler–Snapper and followed Operation Greenhouse.
US ground forces involvement
Four U.S. Army units took part in the Operation Buster–Jangle "Dog" test for combat maneuvers after the detonation of a nuclear weapon took place. These units consisted of:
- 1st Battalion 188th Airborne Infantry Regiment 11th Airborne Division
- 3rd Medical Platoon 188th Airborne Medical Company
- Platoon Company A 127th Engineer Battalion
- Battery C 546th Field Artillery Battalion
Personnel were instructed to create foxholes and construct gun emplacements and bunkers in a defensive position 11 km south of the detonation area. After the nuclear bomb was detonated, the troops were ordered to move forward towards the affected area. While traveling closer to ground zero, troops witnessed the nuclear weapon's effects on the fortifications that were placed in the location in preparation for the tests. The ground troops got as close as 900 meters from ground zero before they were instructed to move out of the area. The Human Resources Research Office was tasked with gathering data on the psychological experiences of the troops after witnessing such a detonation and moving closer towards the affected area.
!style="background:#efefef;" | Date time (UT)
!style="background:#ffdead;" | Local time zone
!style="background:#efefef;" | Location
!style="background:#ffdead;" | Elevation + height
!style="background:#efefef;" | Delivery,<br />Purpose
!style="background:#efefef;" | Device
!style="background:#ffdead;" | Yield
!style="background:#efefef;" class="unsortable" | Fallout
!style="background:#ffdead;" class="unsortable" | References
!style="background:#efefef;" class="unsortable" | Notes
|-
! Able
| 14:00:00.0
| style="text-align:center;" | PST (−8 hrs)|| NTS Area 7
| +
| tower,<br />weapons development
| Mk-6 "Puny Plutonium"
| style="text-align:center;" |
|
|
| Minimum mass design, fizzle (yield "less than a pound"); yet it yielded a lower bound on viable plutonium mass. October 19 attempt failed due to control wiring problem.
|-
! Baker
| 15:20:08.9
| style="text-align:center;" | PST (−8 hrs)|| NTS Area 7
| +
| free air drop,<br />weapons development
| Mk-4 "LT"
| style="text-align:center;" |
| I-131 venting detected,
|
</references>
