The M2 is a motorway in Belfast and County Antrim in Northern Ireland. It is in two sections, the southern section running from north Belfast to Antrim and the northern section acts as a bypass of Ballymena, with the A26 road linking the two sections. In total it is 22 miles (36.2 kilometres). The M2 has the busiest sections of any road or motorway in Northern Ireland. The M2 is one of Northern Ireland's most important motorways, forming most of the main route from Belfast city to both Belfast International Airport and less than a quarter of the way to Derry. It forms part of the unsigned European route E01, E16 and E18 roads.
Route
Southern section
The route starts at as a continuation of the M3 to the west of the River Lagan at Duncairn. It strikes north past the docks and to the east of Fortwilliam before turning west on slip roads at Junction 2. It now runs through the northern suburbs of Belfast past Whitewell and enters the hill section as it climbs at a gradient of up to 1 in 15, one of the steepest in the United Kingdom. It then passes south of Glengormley before leaving the city behind at Ballyvesy. Entering the countryside, it runs parallel to Ballymartin Water before reaching Junction 5 north of Templepatrick, then crosses Six Mile Water before arriving to the north of Burnside at Junction 6. Running around the north of Antrim, shortly after Junction 7 the road meets an incomplete junction where the motorway would have continued to Ballymena. When the road widens, it becomes the M22.
Northern section
The route begins to the south east of Ballymena at Ballycregy as a continuation of the A26 and heads north under the roundabout at junction 10. Running east of Crebilly it crosses the River Braid and turns more north west to the west of Rabbit Hill passes south of Killyflugh, passes east of Leymore and terminates on the A26 by Teeshan. The unbuilt Junction 8 was for Kells and Connor and Junction 9 for a future Ballymena southern bypass.
History
A route roughly along the line of the M2 had been planned since the 1930s, but the first concrete plans for the North Approach were announced in 1946. In 1956 proposals for several motorways, including the M2, were announced with the M2 running directly to Ballymena. Part of this alignment became the A8(M). In 1964 the plans were further extended to route the M2 via Antrim to Coleraine, which is how the plans for construction were then progressed. The A8(M) was already under construction, so it was left as a spur.
Due to financial restraints, it was decided to prioritise the sections of the road required urgently, with the first stage being started on 2 September 1963.
Plans
Southern section
- In April 2008 a plan was approved to construct a flyover enabling a direct link between the M2 and A12 Westlink, to be completed between 2013 and 2018.As of 2025, this development is still in its planning stage.
See also
- M22 motorway (Northern Ireland)
- List of motorways in the United Kingdom
- Roads in Ireland
- Belfast-Derry railway line
References
External links
- CBRD
- Motorway Database – M2 (Northern Ireland)
- CBRD Media:
- Video I including the A8(M)
- Video II from the A2/M5 junction to M3
- Northern Ireland Roads Site – M2
- The Motorway Archive – M2 (Northern Ireland)