400px|thumb|alt=Going east, the M1 and M2 run together from Vanløse to Christianshavn, after which they split. M1 goes south, ending in Vestamager, while the M2 goes southeast, ending in Lufthavnen. The M3 is a circle line connecting the Central Station with Østerbro, Nørrebro, and Frederiksberg. The M4 runs with the M3 between København H and Østerport, splitting off northeast past Østerport to Orientkaj, and south past København H towards København Syd. |Map of the Copenhagen Metro following the Sydhavn extension of the M4 (2024)

thumb|alt=A square steel and glass room with some people waiting. In the middle are the backs of two escalators.|Platform level at [[Forum Station]]

There are 44 stations in the Copenhagen Metro, a driverless rapid transit system serving Copenhagen, Frederiksberg and Tårnby in Denmark. Of the original 22 metro stations, nine are underground, twelve are elevated, and one is at street level. On 28 March 2020, the first part of the M4 line opened, adding two additional stations and an increased number of trains on the København H - Østerport part of the City Circle Line. Transfer from the Copenhagen Metro to regional trains is possible at Copenhagen Central Station, Lufthavnen, Nørreport, Ørestad and Østerport stations. M1 and M2 are in total long, of which is in tunnels and is elevated. It takes 23 minutes to travel on each line from one end to the other. The City Circle Line is intended to form a loop around the city center, with a full circumference taking 25 minutes. The M3 line follows the full circle whilst the M4 line only operates along the eastern half.

Key

thumb|alt=A night view of a viaduct running along the road. In the middle of the image is a glass station.|[[Bella Center Station]]

The following list name the stations that opened between 2002 and 2024. It states the station's name, which lines serve it, whether it is elevated or underground (the grade), travel time in minutes to Nørreport if the station is located on the M1 or M2, the ticket zone and any transfer possibilities available at the station.

{| class="wikitable"

|-

! scope=row style="background-color:#FFFF99"|†

|Terminal station

|-

! scope=row style="background-color:#DDFFDD"|#

|Transfer station

|}

List of stations

thumb|alt=A street intersection. In a traffic island is an elevator marked "Nørreport" and beside it is the top of an escalator|Street-level access to [[Nørreport Station]]

thumb|upright|alt=Two people look up at a train stopped at an elevated glass and concrete station|[[Ørestad Station]]

{|class="wikitable plainrowheaders sortable"

! scope=col | Station

! scope=col | Line

! scope=col | Grade

! scope=col | Opened

! scope=col | Time to Nørreport (M1 and M2)

! scope=col | Zone

! scope=col | Transfer

|-

! scope=row | Aksel Møllers Have

| || Underground || 2019 || N/A || 1 || align=center | —

|-

! scope=row | Amager Strand

| || Elevated || 2007 || || 3 || align=center | —

|-

! scope=row | Amagerbro

| || Underground || 2002 || || 1 || align=center | —

|-

! scope=row | Bella Center

| || Elevated || 2002 || || 3 || align=center | —

|-

! scope=row style="background-color:#DDFFDD" | Christianshavn<sup>#</sup>

| || Underground || 2003 || || 1 || align=center | —

|-

! scope=row | DR Byen

| || Elevated || 2002 || || 1, 3 || align=center | —

|-

! scope=row | Enghave Plads

| || Underground || 2019 || N/A || 1 || align=center | —

|-

! scope=row | Enghave Brygge

| || Underground || 2024 || N/A || 1 || align="center" | —

|-

! scope=row | Fasanvej

| || Underground || 2003 || || 2 || align=center | —

|-

! scope=row | Femøren

| || Elevated || 2007 || || 3 || align=center | —

|-

! scope=row style="background-color:#DDFFDD" | Flintholm<sup>#</sup>

| || Elevated || 2004 || || 2 || S-train

|-

! scope=row style="background-color:#DDFFDD" | Forum<sup>#</sup>

| || Underground || 2003 || || 1 || align=center | —

|-

! scope=row style="background-color:#DDFFDD" | Frederiksberg<sup>#</sup>

| || Underground || 2003 || || 1, 2 || align=center | —

|-

! scope=row | Frederiksberg Allé

| || Underground || 2019 || N/A || 1 || align=center | —

|-

! scope=row style="background-color:#DDFFDD" | Gammel Strand<sup>#</sup>

| || Underground || 2019 || N/A || 1 || align="center" | —

|-

! scope=row | Havneholmen

| || Underground || 2024 || N/A || 1 || align="center" | —

|-

! scope=row | Islands Brygge

| || Underground || 2002 || || 1 || align=center | —

|-

! scope=row | Kastrup

| || Elevated || 2007 || || 4 || align=center | —

|-

! scope=row style="background-color:#DDFFDD" | <sup>#</sup>

| || Underground || 2019 || N/A || 1 || Regional trains, InterCity, X 2000, S-train

|-

! scope=row style="background-color:#FFFF99" | København S<sup>†#</sup>

|

|| Underground || 2024 || N/A || 2 || align="center" | S-train, regional trains

|-

! scope=row style="background-color:#DDFFDD" | Kongens Nytorv<sup>#</sup>

| || Underground || 2002 || || 1 || align=center | —

|-

! scope=row | Lergravsparken

| || Underground || 2002 || || 1 || align=center | —

|-

! scope=row style="background-color:#DDFFDD" | Lindevang<sup>#</sup>

| || Elevated || 2003 || || 2 || align=center | —

|-

! scope=row style="background-color:#FFFF99" | Lufthavnen<sup>†#</sup>

| || Elevated || 2007 || || 4 || Regional trains, <br/>X 2000, EuroNight,<br/>Copenhagen Airport (air travel)

|-

! scope=row style="background-color:#DDFFDD" | Marmorkirken<sup>#</sup>

| || Underground || 2019 || N/A || 1 || align="center" | —

|-

! scope=row | Mozarts Plads

| || Underground || 2024 || N/A || 2 || align="center" | —

|-

! scope=row style="background-color:#DDFFDD" | Nordhavn<sup>#</sup>

| || Underground || 2020 || N/A || 2 || S-train

|-

! scope=row style="background-color:#DDFFDD" | Nørrebro<sup>#</sup>

| || Underground || 2019 || N/A || 2 || S-train

|-

! scope=row | Nørrebros Runddel

| || Underground || 2019 || N/A || 1 || align=center | —

|-

! scope=row style="background-color:#DDFFDD" | Nørreport<sup>#</sup>

| || Underground || 2002 || || 1 || Regional trains, S-train

|-

! scope=row | Nuuks Plads

| || Underground || 2019 || N/A || 1 || align=center | —

|-

! scope=row style="background-color:#FFFF99" | Orientkaj<sup>†</sup>

| || Elevated || 2020 || N/A || 1 || align="center" | —

|-

! scope=row style="background-color:#DDFFDD" | <sup>#</sup>

| || Elevated || 2002 || || 3 || Regional trains

|-

! scope=row |

| || Elevated || 2007 || || 3 || align=center | —

|-

! scope=row style="background-color:#DDFFDD" | <sup>#</sup>

| || Underground || 2019 || N/A || 1 || Regional trains, S-train

|-

! scope=row | Poul Henningsens Plads

| || Underground || 2019 || N/A || 1 || align=center | —

|-

! scope=row style="background-color:#DDFFDD" | Rådhuspladsen<sup>#</sup>

| || Underground || 2019 || N/A || 1 || align="center" | —

|-

! scope=row | Skjolds Plads

| || Underground || 2019 || N/A || 1 || align=center | —

|-

! scope=row | Sluseholmen

| || Underground || 2024 || N/A || 1 || align="center" | —

|-

! scope=row | Sundby

| || Elevated || 2002 || || 3 || align=center | —

|-

! scope=row | Trianglen

| || Underground || 2019 || N/A || 1 || align=center | —

|-

! scope=row style="background-color:#FFFF99" | Vanløse<sup>†#</sup>

| || Street Level || 2003 || || 2 || S-train

|-

! scope=row style="background-color:#FFFF99" | Vestamager<sup>†</sup>

| || Elevated || 2002 || || 3 || align=center | —

|-

! scope=row | Vibenshus Runddel

| || Underground || 2019 || N/A || 1 || align=center | —

|}

<sup>†</sup> <small>Terminal station.</small>

<sup>#</sup> <small>Transfer station.</small>

Future stations

thumb|alt=Four escalators, two going up and two going down. In the background are another four escalators.|Escalators at the underground [[Amagerbro Station]]

The M4 was originally planned to service Trianglen, Poul Henningsens Plads, Vibenshus Runddel and Nørrebro stations on a temporary basis. This plan was later abandoned. Since its opening, the M4 serves the København H - Østerport - Orientkaj route. The City Circle Line opened on 29 September 2019 and two Nordhavn stations opened on 28 March 2020. An extension with five Sydhavn stations (København S - København H) opened on 22 June 2024.

The Nordhavn end of the M4 has 2 stations, while the Sydhavn end will have 5 stations.

As the built up areas of Nordhavn expand towards the North-East, no less than 9 versions of a future extension have been examined.

References

  • Interactive Copenhagen Metro Map
  • Metrostationer
  • Nordhavn extension
  • Sydhavn extension