500px|thumb|right|Map of the Caracas Metro, with current and future or under construction lines and stations (November 2016).The Caracas Metro (referred as El Metro by locals) is a rapid transit system operating in Caracas, capital of Venezuela. , including Los Teques Metro, the Caracas Metro is made up of 52 stations.

Below is a list of the Caracas Metro lines and the stations that they serve.

Line 1 (Red)

Line 1 of the Caracas Metro currently serves 22 stations, and has a route length of . Its initial section opened in 1983 as the city's first rapid transit line.) – <small>future point of transfer to Line 5</small>

  • Los Dos Caminos
  • Los Cortijos
  • La California
  • Petare
  • Palo Verde

Line 2 (Green)

Line 2 operates on much of the same route that Line 4 does. From north-east to south-west its stations are:

  • El Silencio – Point of transfer to Line 1
  • Capuchinos – Point of transfer to Line 4
  • Maternidad
  • Artigas
  • La Paz
  • La Yaguara
  • Carapita
  • Antímano
  • Mamera
  • Caricuao
  • Zoológico
  • Ruiz Pineda
  • Las Adjuntas – Transfer station for Los Teques Metro

Line 3 (Blue)

Line 3 of the Caracas Metro currently serves 8 stations besides the interchange to Line 1, Plaza Venezuela, and has a route length of .

  • Plaza Venezuela – <small>transfer: Line 1; Line 4 (via Zona Rental)</small>
  • Ciudad Universitaria
  • Los Símbolos
  • La Bandera
  • El Valle
  • Los Jardines
  • Coche
  • Mercado
  • La Rinconada – <small>transfer: IFE railway station</small>

Line 4 (Yellow)

Line 4 was operates on much of the same route that Line 2 does.

From east to west:

  • Zona Rental – Point of transfer with Line 1 and Line 3
  • Parque Central
  • Nuevo Circo
  • Teatros
  • Capuchinos – Point of transfer to Line 2

Line 5 (Purple)

This line is still under construction.

First phase – from west to east:

  • Bello Monte
  • Las Mercedes
  • Tamanaco – Future point of transfer to Line 5
  • Chuao
  • Bello Campo
  • Miranda/Hugo Chávez (formerly: Parque del Este II) – Point of transfer to Line 1

The following stations found in the City of Caracas are under construction, as part of the project known as the Guarenas / Guatire Metro:

  • Miranda/Hugo Chávez (formerly: Parque del Este II) – Point of transfer to Line 1
  • Montecristo
  • Boleíta
  • El Marqués
  • Warairarepano – Point of transfer to the Guarenas / Guatire (light rail) line

Line 6 (Orange)

Most of this line is still in planning. It will connect Line 2 and Line 3.

Los Teques Metro (Cyan)

  • Las Adjuntas – transfer station to Caracas Metro Line 2
  • Alí Primera (formerly: El Tambor)
  • Guaicaipuro
  • Independencia
  • Los Cerritos
  • Carrizal
  • Las Minas
  • San Antonio

Guarenas / Guatire (Teal)

This is a light rail line. The following stations are under construction, as part of the project known as the Guarenas / Guatire Metro:

  • Warairarepano – Point of transfer to line Line 5 and the Cabletren of Petare
  • Caucagüita
  • Belén
  • Guarenas I
  • Guarenas II
  • Guatire I
  • Guatire II

References

  • Metro de Caracas, C.A. – official website
  • Caracas at UrbanRail.net