Illinois Route 176 (IL 176) is a east–west state route in northern Illinois. It runs from IL 23 (State Street) in Marengo to the southern terminus of IL 131 (Green Bay Road) in Lake Bluff.
Future
The village of Wauconda hired an engineering firm in 2014 to suggest improvements to the congested interchange with US 12. They proposed eliminating the interchange and converting it to an at-grade intersection with dual left turn lanes at each leg, two lanes in each direction for IL 176, three lanes in each direction of US 12, and developing the frontage of the intersection. The estimated cost to convert the US 12 interchange with IL 176 and the US 12 interchange with IL 59 to at-grade signalized arterial intersections is $300 million, none of which would come from IDOT.
