Fratton railway station is a railway station in the city of Portsmouth, on Portsea Island in England. It was opened in the Fratton area of Portsmouth on 1 July 1885 as an interchange station between the London, Brighton and South Coast Railway and the short-lived Southsea Railway branchline.

Fratton railway station and the Southsea Railway were jointly opened on 1 July 1885 by Lady Ada Mary Willis, wife of General Sir George Willis, the Lieutenant Governor of Portsmouth.

On 4 July 1905, Fratton railway station's name was changed to Fratton & Southsea to promote its Southsea Railway branchline link to the seaside resort of Southsea. After the Southsea Railway branchline was closed on 6 August 1914, the name of the station was eventually changed back to Fratton on 1 December 1921. However, despite Portsmouth & Southsea often being considered the principal station, Fratton is, as of the 2023-24 data collection period, the busiest station in Portsmouth, with Portsmouth & Southsea placing at third place in usage within Portsmouth.

Platforms

Normally, platforms 2 and 3 serve and , with platform 1 serving all other destinations. Platforms 2 and 3 are also signalled to allow northbound passenger departures.

Between 1885 and 1914, a separate island platform at Fratton station served as the interchange platform to the short-lived Southsea Railway branchline. The island was accessed from a staircase built on the south-east side of the main footbridge. This island was demolished after the Southsea Railway was closed. A modern train washing machine structure is now located on the site.

History

thumb|left|The main station buildings in Selbourne Terrace, Fratton.

thumb|left|Fratton train wash, the former site of the [[Southsea Railway island platform]]

thumb|left|Fratton station pedestrian footbridge in Goldsmith Avenue.

The line through Fratton and into central Portsmouth was laid on the abandoned dry canal bed of the unsuccessful Portsmouth and Arundel Canal, which was opened in 1823 and closed in 1827, after seawater from the canal contaminated some of Portsmouth's fresh water wells. In 1845 parts of this section were sold to the Chichester to Portsmouth Branch Railway company with another section being sold to the company in 1851. The former canal walls are still clearly visible between Fratton and Portsmouth city centre today. Canal barges also had an alternative route to and from Portsmouth via Portsbridge Creek, avoiding the need to move through Portsea Island.

The railway line through Fratton was planned by the Brighton and Chichester Railway as part of the Chichester to Portsmouth Branch Railway, approved in 1845. The line was completed in 1847, the Brighton and Chichester railway merging with several other companies to form the London, Brighton and South Coast Railway in 1846, who went on to operate the line.

Fratton railway station was planned and built to serve as an interchange station between Portsmouth and the new one-and-a-quarter mile (2 km) long Southsea Railway branch line, built to serve the fashionable Victorian seaside resort of Southsea. It was built with an additional island platform to the south of the station's three main platforms, which specifically served the Southsea Railway and was reached by a staircase leading from the main overhead footbridge.

Fratton railway station and the Southsea Railway were jointly opened on 1 July 1885 by Lady Ada Mary Willis

In 1891, the main Portsmouth Town engine sheds were moved to the railway sidings at Fratton. and in 2009 for freight trials, this involved DB Schenker Rail (UK) hauling small container trains to and from Eastleigh. The Idea was abandoned in 2010 due to running costs.

Portsmouth Area Resignalling (PARS)

The Portsmouth Area Resignalling project was instigated in late 2006, aiming to improve the flexibility of the track layout in the Fratton area. Platform 1 became the Up Main, Platform 3 became the Down Main with Platform 2 as a bidirectional through platform (although the main function of platform 2 is down line trains). Prior to the project, trains could not reverse south to north at Fratton in service.

The work, scheduled by Network Rail to take place between 23 December 2006 and 4 February 2007, was subject to a massive overrun. The works were first extended six weeks into mid-March 2007 but in late February it became obvious that there were major problems with the new equipment being installed by the contractor Siemens.

Until 1 April 2007 there were only three trains per hour between Fratton and Portsmouth Harbour with the remaining services terminating at Fratton and passengers using a replacement bus service. After 2 April 2007 there were five trains per hour running between Fratton and Portsmouth – three South West Trains services, one Southern service and one Great Western Railway service with some services still terminating at Fratton with passengers forced to change to continue their journey. The 'six-week project' was eventually completed in October 2007 – some ten months after it started.

New footbridge

A new footbridge is now operational, linking the island platform (platforms 2 and 3) with the Up Main platform (1). This has stairs and lifts to allow disabled users full access to all trains, with lifts designed for easy wheelchair use.

Motive power depots

thumb|Fratton Traincare Depot

The London Brighton and South Coast Railway and the London and South Western Railway jointly built a motive power depot at Fratton in 1891, replacing an earlier one at Portsmouth Town station. It was of the double roundhouse type. It came under the ownership of Southern Railway (Great Britain) in 1923 and British Railways in 1948. This building was badly damaged by bombs during the Second World War but repaired in 1948. It closed 2 November 1959, but the building continued to be used for stabling locomotives for several years. They were demolished in 1969. Fratton Traction Maintenance Depot, operated by South Western Railway now occupies part of the site.

Services

Services at Fratton are operated by South Western Railway, Southern and Great Western Railway.

Typical off-peak services are as follows:

South Western Railway

The typical off-peak service in trains per hour is:

  • 2 tph to via (1 semi-fast, 1 stopping)
  • 1 tph to London Waterloo via
  • 1 tph to
  • 4 tph to of which 3 continue to

South Western Railway services at Fratton are operated using and EMUs.

Southern

The typical off-peak service in trains per hour is:

  • 2 tph to via
  • 1 tph to via
  • 3 tph to of which 2 continue to

Southern services at Fratton are operated Class 377 EMUs.

Great Western Railway

The typical off-peak service in trains per hour is:

  • 1 tph to via
  • 1 tph to

Great Western Railway services at Fratton are operated using , and DMUs.

References

Rail Atlas Great Britain & Ireland, S.K. Baker