Bell station is a railway station operated by Metro Trains Melbourne on the Mernda line, part of the Melbourne rail network. It serves the north-eastern suburb of Preston in Melbourne, Victoria, Australia. Bell station opened on 8 October 1889, with the former ground level station closed and demolished in May 2022 and the current elevated station provided in September 2022 by the Level Crossing Removal Project. Bell station initially opened as "Preston-Bell Street" upon its opening in 1889, then it was given its current name of "Bell" on 1 August 1905.

Bell is an elevated premium station, consisting of two side platforms connected by staircases, lifts and a ground level concourse. Bell station fully complies with the Disability Discrimination Act 1992 and is accessible as there is a lift connecting to the ground level concourse and Bell station platforms on either side.

Bell station is owned by VicTrack, a state government agency, and operated by Metro Trains Melbourne. The station is currently served by the Mernda line, part of the Melbourne railway network.

Description

Bell railway station is located in the north-eastern suburb of Preston in Melbourne, Victoria, Australia. It is owned by VicTrack, a state government agency, and operated by Metro Trains Melbourne. Moreover, the station features a ground level concourse, accessible by stairs and lifts up to the elevated platforms. It contains a waiting room, a customer service, PSO office and a ground level concourse connected to the platforms.

Bell station is flanked on its eastern side by an amphitheatre.

The original Bell station was situated next to the former Bell Street level crossing, which was upgraded with manually operated boom barriers in 1969, replacing the interlocking gates. A goods yard originally served Bell, however, it was removed in 1986, leaving only a siding area. On 17 April 1988, the double-line block signalling system between Bell and Reservoir was decommissioned and was replaced with automatic three position signalling. Additionally, in the same month, Bell was enhanced with pedestrian gates at the former Bell Street level crossing, in combination with the manually operated road boom barriers.

Level Crossing Removal Project

In 2014, the first Andrews government announced a $2.4 billion program to remove 50 level crossings in Melbourne, including the Bell Street level crossing. The program was projected for completion by 2022. In January 2016, it was incorporated into the Level Crossing Removal Project program, but at the time, it had not been decided how the grade separation would be realised in regards to the Bell Street level crossing.

On 30 November 2018, the second Andrews government announced that the Level Crossing Removal Project would remove one level crossing at Oakover Road, along with 24 other level crossings across Melbourne as part of a $6.6 billion program. Instead, the level crossing was substituted with the elevated railway option.

The Bell railway station reconstruction began in February 2021 with piling works, installation of fencing around the construction site, and development of foundation for the temporary overhead wiring that would be used in the future elevated railway.

During the major construction period in 2021 and 2022, the Mernda line was closed a few times for maximum of 12 days to facilitate further piling and excavation works. The Mernda line was closed between 5 May to 12 May 2021, when the original Bell station building was demolished to make way for the new elevated railway, followed by the installation of an operational temporary station. Between 17 May to 30 May 2022, the Mernda line was shut down for 12 days to remove the Oakover Road and Bell Street level crossings, get the first part of the elevated railway ready for trains to run on and demolish the old station platforms.

On 30 May 2022, the first part of the two kilometre elevated railway was opened, until 26 August 2022 only a single track was temporarily available because the Mernda line couldn't be closed for no longer than 12 days due to the requirement for trains to regularly access the Epping maintenance yard facility. The new building was built with additional exits opened on the north side.

Services

Bell has two side platforms. Bell station is currently served by the Mernda line, part of the metropolitan railway network. The route 552 and 553 bus stop at the nearby High Street, east of Bell station: the route 552 operates from North East Reservoir to Northcote Plaza, while the route 553 bus operates from Preston to West Preston.

Bus connections:

  • : Eltham station – Glenroy station (via Lower Plenty)