AS-201 (also known as SA-201, Apollo 1-A, or Apollo 1 prior to the 1967 pad fire, flown February 26, 1966, was the first uncrewed test flight of an entire production Block I Apollo command and service module and the Saturn IB launch vehicle. The spacecraft consisted of the second Block I command module and the first Block I service module. The suborbital flight was a partially successful demonstration of the service propulsion system and the reaction control systems of both modules, and successfully demonstrated the capability of the command module's heat shield to survive re-entry from low Earth orbit.
Vehicle configuration
Spacecraft
The command and service module CSM-009 was a Block I version, designed before the lunar orbit rendezvous method was chosen for the Apollo lunar landing; therefore it lacked capability to dock with a lunar module. Block I also employed preliminary designs of certain subsystems, and was heavier than the Block II version with lunar mission capability. All previous command and service modules flown (with one exception) were boilerplate versions.
CM-009 was the second production Block I command module to fly, the first being CM-002 flown on a Little Joe II rocket for the final launch escape system abort test, designated A-004. CM-009 varied from the production configuration by the omission of the guidance and navigation system; crew couches, displays, and associated equipment; and by the addition of a control programmer and open-loop emergency detection system.
SM-009 was the first production Block I service module to fly. It varied from the production configuration by replacement of the electrical power-generating fuel cells with batteries, and omission of the S-band communication equipment.
The launch also included a Block I launch escape system (LES), and the first flight of the Spacecraft–LM adapter (SLA) which connected the spacecraft to the launch vehicle.
Launch vehicle
The Saturn IB was the uprated version of the Saturn I rocket flown in ten earlier Apollo missions. It featured an upgrade of the first stage (S-IB-1) engines to increase total thrust from of thrust to , and replacement of the second stage with the S-IVB. This stage used a new liquid hydrogen-burning J-2 engine which would also be used on the S-II second stage of the Saturn V lunar launch vehicle. A modified version of the S-IVB, with an in-space restartable J-2, would also be used as the third stage of the Saturn V. It also used a new model of the guidance and control system known as the Instrument Unit, which would also be used on the Saturn V.
Objectives
The objectives of the mission were to:
- Demonstrate the Saturn IB launch vehicle propulsion, guidance and electrical systems
- Demonstrate structural compatibility between the launch vehicle and CSM, ensuring the spacecraft's design loads weren't exceeded
- Demonstrate appropriate separation of all vehicle elements
- Demonstrate the CSM's heat shield, service propulsion system (including in-space restart), CM and SM reaction control systems, environmental control of cabin pressure and temperature, partial communications, stability and control, Earth landing system, and electrical power subsystem.
- Evaluate the Emergency Detection System in an open-loop configuration
- Demonstrate the CM heat shield ablator at a 200 BTU/ft<sup>2</sup>/sec heat transfer rate
- Demonstrate support facilities for launch, mission control, and recovery
The mission profile called for the Saturn IB to launch the spacecraft on an east-by-southeast heading into a high ballistic trajectory; then the CSM would separate from the SLA. The service module engine would be fired twice, then the command module would re-enter and land in the south Atlantic Ocean.
Preparation for flight
thumb|S-IB-1 undergoing a full-duration static firing at [[Marshall Space Flight Center|MSFC on April 13, 1965]]
thumb|S-IB-1 undergoing propellant tests for AS-201 on December 20, 1965
The first piece of the rocket to arrive at the Cape was the S-IB stage on August 14, 1965, by the barge Promise. It was built by Chrysler and featured eight H-1 engines built by Rocketdyne. The S-IVB second stage arrived next on September 18. The Instrument Unit that would control the launch vehicle arrived October 22, the command module arrived three days later and the service module on October 27.
The first stage was erected at the pad soon after arriving at Cape Kennedy. The second stage joined it on October 1. After fixing some problems in the Instrument Unit it was mated to the S-IVB on October 25. The CSM was mated on December 26.
The CSM then fired its own rocket to accelerate the spacecraft towards Earth. The first burn lasted for 184 seconds. It then fired later for ten seconds. This proved that the engine could restart in space, a crucial part of any crewed flight to the Moon.
It entered the atmosphere traveling . It splashed down 37 minutes after launch, from the planned touch down point, and was on board the aircraft carrier two hours later.
Problems
right|thumb|AS-201 CM-009 exhibited at the Strategic Air and Space Museum.
There were three problems encountered on the flight. The service module engine worked properly for only 80 seconds, interrupted by the presence of helium pressurant gas in the combustion chamber. Helium was used to pressurize the fuel tanks but should not have been in the combustion chamber. This was caused by a break in an oxidizer line that allowed helium to mix with the oxidizer.
The second problem was an electrical system failure which caused the command module to lose steering control during reentry. Last, measurements that were intended to be taken during reentry, failed due to a short circuit. Both of these problems were found to be due to incorrect wiring, and were easily fixed.
Capsule location
After the flight the capsule was also used for drop tests at White Sands Missile Range. It is now on display at the Strategic Air Command & Aerospace Museum, Ashland, Nebraska.
See also
- Splashdown
References
External links